4.8 Article

Effect of operational strategies on the rapid start-up of nitrogen removal aerobic granular system with dewatered sludge as inoculant

期刊

BIORESOURCE TECHNOLOGY
卷 315, 期 -, 页码 -

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.biortech.2020.123816

关键词

Aerobic granular sludge; Dewatered sludge; Nitrogen removal; Operational strategy; Filamentous bacteria

资金

  1. National Natural Science Foundation of China [51574238]
  2. Central University Hundred Project of China [2682013BR014EM]

向作者/读者索取更多资源

In both sequencing batch reactors with dewatering sludge as inoculant, the strategies by step-feeding (R1) or step-feeding combined with low aeration (R2) were performed under alternating anoxic/aerobic condition to discover superior methods launching nitrogen removal aerobic granule system. Interestingly, two reactors accomplished granulation at day 0, two days later, possessed prominent settling performance (SVI < 45 ml/g. MLSS) and denitrifying ability (TIN > 80%). Thereinto, R2 had lower crushing rate, larger granules, higher biomass and better pollutant removal performance owing to low aeration and more filamentous bacteria on AGS surface. Moreover, effluent NH4+-N was used as indicator of excess filaments due to its quick response for the filaments. After effluent NH4+-N exceeded 5 mg/L, causative filaments Sphaerotilus were effectively inhibited and eliminated by enhancing pH value to 8.0 +/- 0.2. As a result, this study provides a new insight into rapid start-up nitrogen removal granule system by promoting and limiting filaments in proper period.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据