4.5 Article

The risk analysis of the electrical Cross-tie for extended Station Blackout in Multi-Unit site

期刊

ANNALS OF NUCLEAR ENERGY
卷 147, 期 -, 页码 -

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.anucene.2020.107660

关键词

NPP; Station Blackout; SBO; Cross-tie; EDG; PRA; AIMS-PSA

资金

  1. Khalifa University of Science and Technology (KUST)
  2. Federal Authority for Nuclear Regulation (FANR)
  3. Korea Atomic Energy Research Institute (KAERI)

向作者/读者索取更多资源

The SBO is defined as the events of Loss of Offsite Power (LOOP) combined by loss of dedicated Emergency Diesel Generators(EDGs) for each unit. The SBO can be also extended when the shared Diesel Generator (AAC-DG) is lost additionally. The Electrical Cross-tie (ECT) is the concept of sharing other unit's dedicated EDG to the unit under extended SBO in the multi-unit NPP site. We re-evaluate the risk of the extended SBO with the ECT option in Single Unit PRA considering Multi-Unit Features. To get a more realistic estimation of Core Damage Frequency (CDF), we developed the KU-PRA model using the AIMS-PSA code. We examined the factor of redundancy of the AC sources on the CDF by adding additional EDGs to the reference KU-PRA Model. We developed methodology and modeling of the Electrical Cross-tie for Multi-units PRA considering Common Cause Failure, Human Reliability Analyses, Battery load shedding, and Occupancy factor. (C) 2020 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据