An Integrated Transmission Expansion and Sectionalizing-Based Black Start Allocation of BESS Planning Strategy for Enhanced Power Grid Resilience

期刊

IEEE ACCESS
卷 8, 期 -, 页码 148968-148979

出版社

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/ACCESS.2020.3014341

关键词

Resilience; Load flow; Generators; Power grids; Indexes; Power system stability; Black start; battery energy storage system (BESS); load shedding; integrated planning; resilience enhancement; robust optimization

向作者/读者索取更多资源

This paper proposes a new comprehensive integrated planning strategy for the resilience enhancement of power system, including determining the transmission expansion and sectionalizing-based optimal black start (BS) resources allocation of battery energy storage system (BESS) during extreme events. The planning model comprises of two stages, namely the normal stage and resilience stage. The first stage is to make the collaborative planning decisions, i.e., constructing transmission lines and installation of BESS as BS sources. The second stage minimizes the power system generation cost and load shedding cost under disaster conditions. The planning algorithm is developed to describe the uncertainty of transmission lines outage status, which can be affected by the normal stage expansion states. In algorithm ways, the model was solved with a duality-based column and constraint generation (D-CCG) method. Taking IEEE 30-bus and 39-bus system for examples and GUROBI/CPLEX was utilized to solve proposed model. Numerical cases show the effectiveness of the model and the superiority of the solution strategy.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据