Measuring the Impact of Scope Changes on Project Plan Using EVM

期刊

IEEE ACCESS
卷 8, 期 -, 页码 154589-154613

出版社

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/ACCESS.2020.3018169

关键词

Earned value management; project monitoring and controlling; software project scope rating index; Monte Carlo simulations

资金

  1. Deanship of Scienti~c Research (DSR), King Abdulaziz University, Jeddah [D-648-611-1441]

向作者/读者索取更多资源

Earned Value Management (EVM) measures project performance against a baseline plan. It identifies deviations in budget and schedule, aids project managers in taking earlier corrective actions against cost and schedule overruns. Although the literature highlights the significance of scope by adopting it as a leading indicator to measure project success or failure. However, EVM does not include scope when evaluating the performance of any software project. While considering the importance of scope and its ever-changing nature, it is imperative to measure the effect of changes in scope on the project plan. To analyse such effects, this study aims to enhance the traditional EVM by incorporating scope into it. The main objectives of this paper are: i) to extract the effects of project scope changes, ii) to map extracted effects of project scope changes with Software Project Scope Rating Index (SPSRI) elements, and iii) to quantify the extracted effects and integrate them with EVM. An extensive literature review is conducted to achieve the first objective, which results in the seventeen unique effects; that were used to map with SPSRI elements. To forecast the variations in scope for a given project budget, Monte Carlo simulations were run on the top eight scope elements, whereas, the results were incorporated with EVM to identify the deviations between actual and projected values of scope's score and cost. Finally, the multivariate regression model was used to evaluate the influence of individual element on the overall estimated cost of the project. The correlation between the independent variables (SPSRI elements) and the dependent variable (overall cost) was calculated along with the valuation of each independent variable on the dependent variable. Moreover, the effects are statistically shown that independent variables have influenced the dependent variable. This technique could assist the project managers to forecast deviations in project scope earlier.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据