4.7 Article

Ramp Requirement Design for Reliable and Efficient Integration of Renewable Energy

期刊

IEEE TRANSACTIONS ON POWER SYSTEMS
卷 32, 期 1, 页码 562-571

出版社

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TPWRS.2016.2555855

关键词

Monte-Carlo simulation; ramp capabilities; real-time dispatch; renewable energy; requirement design

资金

  1. National Science Foundation [ECCS-1028870]
  2. MISO

向作者/读者索取更多资源

With increasing renewable penetration, several ISOs are instituting ramp capability products to manage the operational challenge of balancing power in real-time. For example, in MISO's plan, ramp capabilities would be secured 10 min ahead based on the Gaussian-sigma rule (2.5 standard deviations for 99% confidence level). These products are used to manage both net load variations (foreseeable changes) and uncertainties (unforeseeable changes) through economic dispatches every 5 min. Ramp capabilities secured at time t may not be available to meet the uncertain net load at after the dispatch at t + 5 min. As a result, the required confidence level may not be satisfied. Also, the Gaussian-sigma rule is for reliability only, and might not be cost efficient. The requirement design can thus be subtle. This paper is on the analysis and design of reliable and efficient ramp capability products. To truly satisfy the required confidence level, our idea is to keep enough of the ramp capabilities secured at t for t + 10 min by adding constraints on the dispatch at t + 5 min. Moreover, costs are minimized by selecting the proper number of standard deviations through simulation-based optimization. Numerical results show that net load variations and uncertainties are effectively managed with significant cost savings.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据