4.7 Article

Wind Power Providing Flexible Ramp Product

期刊

IEEE TRANSACTIONS ON POWER SYSTEMS
卷 32, 期 3, 页码 2049-2061

出版社

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TPWRS.2016.2603225

关键词

Wind power; flexibility; ramp capacity; ramp product; real-time unit commitment; stochastic programming

资金

  1. Department of Energy under DOE [DE-AC02-06CH11357]
  2. Ministry of Science and Technology of China [2015BAA01B04]

向作者/读者索取更多资源

The deepening penetration of renewables in power systems has contributed to the increasing need for generation flexibility. Specifically, for short-term operations, flexibility here indicates that sufficient ramp capacity is available to respond to the varying load and intermittent generation. To address the growing needs for ramp capacity, markets for ramp products have been launched in practice such as those in California ISO and Midcontinent ISO. Sometimes, expensive fast-start units must be committed in real time to guarantee sufficient ramp capacity. Occasionally even worse, inadequate ramp capacity from the given generation portfolio might lead to curtailment of renewable generation or load shedding. Therefore, more supplies of ramp capacity are required. In fact, wind power producers (WPPs) are physically capable of offering ramp services, which gives us a potential option. In this paper, we attempt to explore the mechanism and economic impacts of including WPPs as ramp capacity providers. To conduct the analyses, a two-stage stochastic real-time unit commitment model considering ramp capacity adequacy is formulated. Case studies indicate that both the system and the WPPs can benefit in the proposed framework.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据