期刊
FUSION ENGINEERING AND DESIGN
卷 122, 期 -, 页码 288-298出版社
ELSEVIER SCIENCE SA
DOI: 10.1016/j.fusengdes.2017.05.053
关键词
Power exhaust; Reactor relevant; Edge bulk integration
The main goal of the Divertor Tokamak Test facility (DTT) is to explore alternative power exhaust solutions for the next step after ITER, i.e., a demonstration power plant DEMO that will explore steady-state operation.The principal objective of DTT is to mitigate the risk of a difficult extrapolation to fusion reactor of the conventional divertor based on detached conditions under test on ITER. The task includes several issues, but with the main target to study the completely integrated (physics-technology and bulk-edge) power exhaust problems and to demonstrate how the possible implemented solutions (e.g., advanced divertor configurations or liquid metals) can be integrated in a DEMO device. This paper shows how the parameters for the design of a flexible facility, capable to perform this difficult task, can be worked out within the constraint of a fixed budget. (C) 2017 Published by Elsevier B.V.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据