4.3 Article

Examining of rock drilling properties in underground metal mine excavation

期刊

出版社

ACAD BRASILEIRA DE CIENCIAS
DOI: 10.1590/0001-3765202120191202

关键词

Drillability; brittleness; bedding types; rock mechanics

向作者/读者索取更多资源

The study aims to examine and analyze the drilling operation and its duration in underground ore and dead rock by conducting drillability experiments on core samples. The results show that production galleries and holes formed parallel to bedding would increase production efficiency. Additionally, it is found that drilling speed increases steadily to a maximum point in the first 5 seconds and then remains stable, indicating the importance of drilling direction in enhancing efficiency.
In underground metal mines, drilling and blasting is widely used production method. Drilling holes is especially a time consuming operation. The aim of this study is to examine and analyze drilling operation and its duration in underground ore and dead rock. Drillability experiments are carried out on samples taken from the field. In core sampling two different types of core samples are taken whether it is parallel or perpendicular to ore bedding and dead rock. Results of drillability experiments are compared between the two types of core samples. DRI values are found to be 51 and 47 for the parallel and perpendicular core samples to ore bedding, respectively. DRI values for the parallel and perpendicular core samples to dead rock bedding are found to be 57 and 55 for the, respectively. In addition, graphs of drilling speed and drilling depth belonging to ore and dead rock are analyzed. It is examined that drilling speed increases steadily to maximum point in the first 5sec. and stays stable after that point. Therefore, it is concluded that production galleries and holes which are formed parallel to bedding would increase production efficiency.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.3
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据