4.6 Article

Productivity improvement and multiple management controls: evidence from a manufacturing firm

出版社

EMERALD GROUP PUBLISHING LTD
DOI: 10.1108/IJOPM-09-2020-0667

关键词

Management control systems; Productivity; Manufacturing

向作者/读者索取更多资源

This study explores the multiplicity and interrelationships of management control systems in productivity improvement in manufacturing. The research shows a wide range of MCSs involved in PI, and reveals both complementary and conflicting relationships among them. Managers rely on mechanisms to manage tensions and strengthen complementarities among these MCSs.
Purpose The present paper explores the multiple management control systems (MCSs) involved in productivity improvement (PI) in manufacturing and how they interrelate. Research has largely neglected the multiplicity and interrelationships of these MCSs. Design/methodology/approach Drawing on an abductive case study approach, the authors collected empirical data from a global automotive supplier that produces complex systems for passenger cars. Recent PI activities are analysed to identify and explain the interrelationships among the multiple MCSs affecting these activities. Findings The study shows how a broad range of MCSs are involved in PI. The study identifies and explores both complementary and conflicting relationships among the MCSs and demonstrates how managers rely on a set of mechanisms to alleviate tensions and strengthen complementarities among these MCSs. Research limitations/implications As this paper is based on a single case study, future research can contribute further generalisations (analytical and statistical) with respect to the MCSs involved in PI, how they are interrelated and which mechanisms managers use to manage their interrelationships. Practical implications Managers seeking to control and improve productivity should consider the complete control package and its interrelationships instead of focussing on each MCS separately. Originality/value The present paper contributes to the knowledge of the multiplicity and interrelationships of MCSs involved in PI and the type of managerial work required to manage their interrelationships.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据