4.7 Article

Graph Computing Based Security Constrained Unit Commitment in Hydro-thermal Power Systems Incorporating Pumped Hydro Storage

期刊

CSEE JOURNAL OF POWER AND ENERGY SYSTEMS
卷 7, 期 3, 页码 485-496

出版社

CHINA ELECTRIC POWER RESEARCH INST
DOI: 10.17775/CSEEJPES.2020.04590

关键词

Graph computing; hydro-thermal system; mixed integer programming; network security; unit commitment

向作者/读者索取更多资源

This paper introduces a graph computing-based framework for solving the security-constrained unit commitment problem in hydro-thermal power systems incorporating pumped hydro storage, considering economic and technical impacts. It formulates a MIP model with mathematical models of thermal units, cascade hydropower stations, and PHS stations, and introduces optimization methods for faster computation. Case studies on real power systems demonstrate the feasibility and validity of this framework.
This paper proposes a graph computing based mixed integer programming (MIP) framework for solving the security constrained unit commitment (SCUC) problem in hydro-thermal power systems incorporating pumped hydro storage (PHS). The proposed graph computing-based MIP framework considers the economic operations of thermal units, cascade hydropower stations and PHS stations, as well as their technical impacts towards the network security. First, the hydro-thermal power system data and unit information are stored in a graph structure with nodes and edges, which enables nodal and hierarchical parallel computing for the unit commitment (UC) solution calculation and network security analysis. A MIP model is then formulated to solve the SCUC problem with the mathematical models of thermal units, cascade hydropower stations and PHS stations. In addition, two optimization approaches including convex hull reformulation (CHR) and special ordered set (SOS) methods are introduced for speeding up the MIP calculation procedure. To ensure the system stability under the derived UC solution, a parallelized graph power flow (PGPF) algorithm is proposed for the hydro-thermal power system network security analysis. Finally, case studies of the IEEE 118-bus system and a practical 2749-bus hydro-thermal power system are introduced to demonstrate the feasibility and validity of the proposed graph computing-based MIP framework.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据