Optimizing the open pit-to-underground mining transition

期刊

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
卷 257, 期 1, 页码 297-309

出版社

ELSEVIER SCIENCE BV
DOI: 10.1016/j.ejor.2016.07.021

关键词

Mining/metals industries: optimal extraction sequence; Production scheduling: transition problem; Integer programming applications: exact and heuristic approaches

资金

  1. Center for Innovation in Earth Science and Engineering at the Colorado School of Mines
  2. Alford Mining Systems
  3. FONDECYT [1151098]
  4. CONICYT PIA Anillo grant [1407]

向作者/读者索取更多资源

A large number of metal deposits are initially extracted via surface methods, but then transition underground without necessarily ceasing to operate above ground. Currently, most mine operators schedule the open pit and underground operations independently and then merge the two, creating a myopic solution. We present a methodology to maximize the NPV for an entire metal deposit by determining the spatial expanse and production quantities of both the open pit and underground mines while adhering to operational production and processing constraints. By taking advantage of a new linear programming solution algorithm and using an ad-hoc branch-and-bound scheme, we solve real-world scenarios of our transition model to near optimality in a few hours, where such scenarios were otherwise completely intractable. The decision of where and when to transition changes the net present value of the mine by hundreds of millions of dollars. (C) 2016 Elsevier B.V. All rights reserved.