4.7 Article

Integrated production and preventive maintenance scheduling for a single machine with failure uncertainty

期刊

COMPUTERS & INDUSTRIAL ENGINEERING
卷 80, 期 -, 页码 236-244

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.cie.2014.12.017

关键词

Single machine scheduling; Preventive maintenance; Machine reliability; Proactive

资金

  1. National Natural Science Foundation of China [71171130, 61273035, 61473211]
  2. China Postdoctoral Science Foundation [2014M561465]

向作者/读者索取更多资源

This paper addresses the problem of finding a robust and stable schedule for a single machine with availability constraints. The machine suffers unexpected breakdowns and follows the Weibull failure function. A joint model for integrating run-based preventive maintenance (PM) into the production scheduling problem is proposed, in which the sequence of jobs, the PM times and the planned completion times of jobs are proactively determined simultaneously. Aiming at optimizing the bi-objective of system robustness and stability, a genetic algorithm based on the properties of the optimal schedule is proposed. The experimental results demonstrate that the proposed algorithm is efficient and effective under practical problem sizes. In addition, the impact of degree of uncertainty on the performance and the tradeoff between robustness and stability are explored in detail. (C) 2014 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据