4.7 Article

Influences of operational parameters on phosphorus removal in batch and continuous electrocoagulation process performance

期刊

ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH
卷 24, 期 32, 页码 25441-25451

出版社

SPRINGER HEIDELBERG
DOI: 10.1007/s11356-017-0180-2

关键词

Electrocoagulation; Iron electrode; Phosphorus removal; Energy consumption; Response surface methodology

资金

  1. Korean Ministry of Environment, as a Global Top Project [2016002210003]
  2. New & Renewable Energy Core Technology Program of the Korea Institute of Energy Technology Evaluation and Planning (KETEP) - Ministry of Trade, Industry & Energy, Republic of Korea [20143030101040]
  3. Korea Evaluation Institute of Industrial Technology (KEIT) [20143030101040] Funding Source: Korea Institute of Science & Technology Information (KISTI), National Science & Technology Information Service (NTIS)

向作者/读者索取更多资源

Performance of an electrocoagulation (EC) process in batch and continuous operating modes was thoroughly investigated and evaluated for enhancing wastewater phosphorus removal under various operating conditions, individually or combined with initial phosphorus concentration, wastewater conductivity, current density, and electrolysis times. The results revealed excellent phosphorus removal (72.7-100%) for both processes within 3-6 min of electrolysis, with relatively low energy requirements, i.e., less than 0.5 kWh/m(3) for treated wastewater. However, the removal efficiency of phosphorus in the continuous EC operation mode was better than that in batch mode within the scope of the study. Additionally, the rate and efficiency of phosphorus removal strongly depended on operational parameters, including wastewater conductivity, initial phosphorus concentration, current density, and electrolysis time. Based on experimental data, statistical model verification of the response surface methodology (RSM) (multiple factor optimization) was also established to provide further insights and accurately describe the interactive relationship between the process variables, thus optimizing the EC process performance. The EC process using iron electrodes is promising for improving wastewater phosphorus removal efficiency, and RSM can be a sustainable tool for predicting the performance of the EC process and explaining the influence of the process variables.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据