Fuzzy based risk assessment module for metropolitan construction project: An empirical study

期刊

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.engappai.2017.04.019

关键词

Risk assessment; Construction projects; Fuzzy set theory; Risk rating; Risk categorization

向作者/读者索取更多资源

The work proposes an integrated risk assessment route in relation to metropolitan construction projects based on the fuzzy set theory. A hierarchical risk break-down structure has been conceptualized to facilitate the task of risk assessment. The risk extent (rating) corresponding to a particular risk source has been expressed as a function of two parameters: likelihood (possibility) of occurrence and impact (consequence of occurrence). The concept of risk matrix has been explored herein to categorise various risk factors at different levels of severity for the establishment of necessary actions requirement plan. A case study of a metropolitan construction project for building an underground metro rail station has been reported here to demonstrate application procedural steps of the proposed methodology. (C) 2017 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据