Correction

Energy-Oriented Scheduling for Hybrid Flow Shop With Limited Buffers Through Efficient Multi-Objective Optimization (vol 7, pg 34477, 2019)

期刊

IEEE ACCESS
卷 10, 期 -, 页码 45289-45289

出版社

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/ACCESS.2022.3169583

关键词

Job shop scheduling; Optimization

资金

  1. National Natural Science Foundation of China [61873042]
  2. Fundamental Research Funds for the Central Universities [2018CDXYCL0018]
  3. Promotion Project of Basic Ability of Young and Middle-Aged Teachers in Universities of Guangxi [ky2016YB152]
  4. Guangxi Key Laboratory of Automatic Detection Technology and Instrument [YQ16109]

向作者/读者索取更多资源

The grant number of the National Natural Science Foundation of China (NSFC) is incorrect in the above article.
In the above article [1], the grant number of the National Natural Science Foundation of China (NSFC) is an error.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

推荐

暂无数据
暂无数据