4.2 Article

Mitigation of Cyanobacterial Harmful Algal Blooms (cHABs) and Cyanotoxins by Electrochemical Oxidation: From a Bench-Scale Study to Field Application

期刊

ACS ES&T ENGINEERING
卷 2, 期 7, 页码 1160-1168

出版社

AMER CHEMICAL SOC
DOI: 10.1021/acsestengg.1c00344

关键词

harmful algal bloom; electrochemical oxidation; cyanobacteria; microcystins

资金

  1. New York State Department of Environmental Conservation [MOU AM10700, ESF-PRJ-19-07]

向作者/读者索取更多资源

In this study, an emergency-responsive electrochemical oxidation and filtration (EOF) process was developed to effectively treat cyanobacterial harmful algal blooms (cHABs) and cyanotoxins. The results showed that the EOF process could inactivate and destroy cyanobacteria and cyanotoxin microcystinLR by generating locally concentrated free chlorine. Additionally, the concentration of disinfection byproducts generated by EOF was significantly lower compared to chlorination.
ABSTRACT: Cyanobacterial harmful algal blooms (cHABs) and the concurrent release of cyanotoxins have become an emerging threat to aquatic life and drinking water safety. It is challenging for conventional frequently and irregularly. This study developed an emergencyresponsive electrochemical oxidation and filtration (EOF) process that enables the pump-and-treat of phytoplankton plumes and cyanotoxins. Fundamental studies indicate that the EOF process generated locally concentrated free chlorine (>16 times higher than the bulk chlorine concentration) at the porous Ti4O7 filter anode surface. Lab tests showed that cyanobacteria and the cyanotoxin microcystinLR were inactivated and destroyed by free chlorine when passing through the porous anode. Additionally, the concentration of disinfection byproducts generated by EOF was five times less than chlorination to achieve the same level of treatment. A boatmount full-scale EOF system was developed and deployed in Lake Neatahwanta impacted by cHAB. The system can effectively remove >50% of phytoplankton and >80% of the ambient cyanotoxins at a treatment capacity of 110 m3/day and energy consumption of 1.1 kWh/m3. Instant improvement of effluent water clarity was achieved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.2
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据