A Bi-Objective Model for a Stage Shop Scheduling Problem with HumanRobot Collaboration

期刊

IFAC PAPERSONLINE
卷 55, 期 10, 页码 1290-1295

出版社

ELSEVIER
DOI: 10.1016/j.ifacol.2022.09.568

关键词

Stage shop scheduling; Human-Robot collaboration; Bi-objective model; TH method

向作者/读者索取更多资源

This study utilizes a bi-objective linear model to minimize makespan and cost in the stage shop problem by allocating jobs to humans and robots. An interactive method is used to convert the model into a single objective one. Sensitivity results demonstrate that human-robot collaboration significantly reduces makespan.
Stage shop scheduling is a type of manufacturing problem, in which operations need to be done on a group of jobs and are separated into different phases depending on their types. The stages are carried out in a sequential order; however, the operations within each stage are carried out in any order. In other words, the operations of a stage cannot be initiated until all operations of the previous stage are completed. Human-robot collaboration has become more popular as technologies and business empowerment has brought humans and robots closer together. In this study, jobs are allocated to humans and robots by presenting a bi-objective linear model to minimize the makespan and the cost of utilizing agents in a stage shop problem. Moreover, an interactive method is used to convert the model into a single objective one. The sensitivity results show that the makespan is minimized noticeably by collaborating the human and robots. Copyright (C) 2022 The Authors.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

3.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据