Methodology for construction-standard-production-rate-based simulation modeling and production-rate data generation

出版社

TAYLOR & FRANCIS LTD
DOI: 10.1080/13467581.2023.2278885

关键词

Production-rate; simulation; construction-standard-production-rate; data generation

向作者/读者索取更多资源

Production-rate assessment is crucial for the success of a construction project, and the use of construction-standard-production-rate (CSPR) in South Korea is limited to individual equipment. This study aims to generate data on production-rates of different equipment combinations and test the feasibility of using such data for optimized fleet management and scheduling methods. The research uses discrete event simulation and regression analysis based on CSPR equations and information to achieve these goals.
While implementing a construction project, production-rate assessment needs to be conducted throughout the different stages of the project because this assessment can determine the success or failure of the project. In South Korea, the construction-standard-production-rate (CSPR) is used for determining the production-rate of individual construction equipment. However, CSPR cannot provide the production-rate of activities considering a combination of more than two different types of equipment (eg, excavator and dump truck used for excavation-load-haul activities). Having ready-made data on such production-rates of different equipment combinations would be beneficial for determining and optimal fleet management plan. Furthermore, such data can be beneficial for implementing optimized scheduling methods using supervised-learning methods. Accordingly, simple discrete event simulation approaches were carried out for data generation and regression analysis for testing the feasibility of the usage of such data. The time inputs used in this study were calculated based on the equations and information given in the CSPR.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.3
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据