4.2 Article

Heuristic methods for postoutage voltage magnitude calculations

出版社

Tubitak Scientific & Technological Research Council Turkey
DOI: 10.3906/elk-1301-124

关键词

Contingency studies; branch outage; intelligent methods; particle swarm optimization; differential evolution; harmony search

向作者/读者索取更多资源

Power systems play a significant role in every aspect of our daily lives. Hence, their continuation without any interruption (or with the least duration of interruption due to faults or scheduled maintenances) is one of the key aims of electrical energy providers. As a result, electrical energy providers need to check in great detail the integrity of their power systems by performing regular contingency studies of the equipment involved. Among others, line and transformer outage simulations constitute an integral part of an electrical management system. Both accuracy and calculation speed depend on the branch outage model and/or the solution algorithms applied. In this paper, the local constrained optimization problem of the single-branch outage problem is solved by intelligent methods: particle swarm optimization, differential evolution, and harmony search. Simulations of IEEE 14-, 30-, 118-, and 300 -bus systems are computed both by intelligent methods and by AC load flow. The results of the intelligent method -based simulations and AC load flow -based simulations are compared in terms of accuracy and computation speed.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.2
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据