4.7 Article

Vibrations induced by high initial stress release during underground excavations

期刊

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.tust.2016.01.017

关键词

Deep underground; Dynamic process; Unloading vibration; Unloading waveform

资金

  1. National Natural Science Foundation of China [41272304, 11472311, 51274254]
  2. National Basic Research Program of China [2010CB732004, 2015CB060200]
  3. Graduated Students' Research and Innovation Fund Project of Central South University [2014zzts054]

向作者/读者索取更多资源

Excavation unloading under high initial stress is a typical dynamic process subjected to the combined effects of different factors. In this study, a mathematical physics method for a two-dimensional circular excavation was developed to investigate the mechanism involved in unloading vibration, which is capable of providing insights into the quantitative relationships between vibration features and correlative factors such as the initial stress, cross-sectional area of the tunnel, unloading rates and unloading paths. Then the dynamic unloading excavation process was implemented in the discrete element program PFC 2D for numerical analysis after verifications against the theoretical results. In particular, the characteristics of unloading waveform under high initial stress were investigated for various ratios of horizontal and vertical in situ stresses and aspect ratios of rectangular tunnels. The temporal and spatial characteristics of the excavation process can also be illustrated. In a practical project which considered the combined action of both the blast and unloading vibration, the finite difference program FLAC 3D was further adopted to investigate the contribution of unloading vibration to the character of the seismogram. Results are presented which indicate the 2D numerical analysis provides satisfactory approximation to the excavation process. While the peak particle velocity (PPV) is in direct proportion to the in situ stress variation, it decreases significantly along with the increase of unloading time. In addition, excavation by drill-and blast (D&B) method should be taken as a dynamic process of blast loading before unloading in a period of time, instead of instantaneous unloading. Although unloading vibration can be generated and significant damage around the tunnel can be induced in the process, distinct unloading vibration can only be generated under high in situ stress and unloading rate. (C) 2016 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据