4.7 Article

Numerical simulation of air ventilation in super-large underground developments

期刊

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.tust.2015.11.009

关键词

Ventilation; Super-large underground development; Carbon monoxide; Dust

资金

  1. University of Queensland

向作者/读者索取更多资源

Recent advancements in engineering technology have enabled the construction of super-large underground engineering projects in China. Currently, the ventilation requirements and standards of normal-size underground spaces are used for super-large underground excavating engineering projects in China. For example, the minimum air velocity of 0.15 mks is the standard velocity for normal-size underground spaces; however, this value is also used as the required air velocity for diluting underground contaminants in super-large underground developments. This paper aims to examine the minimum ventilation requirements for super-large underground developments (S > 100 m(2)). A three-dimensional computational domain representing a full-scale underground space has been developed. The pertinent parameters such as dust concentration, smoke density, oxygen concentration and air temperature have been simulated. The results show that at some specific underground conditions, the ventilation air velocity of 0.15 m/s is sufficient to control the dust level, provide required oxygen concentration and maintain the air temperature at acceptable levels during development; however, it is not sufficient to bring the CO concentration below an acceptable safe limit. This must be considered by the ventilation system designers of super-large underground developments. (C) 2015 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据