4.7 Article

Salinity gradient energy potential at the hyper saline Urmia Lake - ZarrinehRud River system in Iran

期刊

RENEWABLE ENERGY
卷 86, 期 -, 页码 154-162

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.renene.2015.08.015

关键词

Renewable energy; Blue energy; Salinity gradient energy; Reverse electrodialysis (RED); Pressure retarded osmosis (PRO); Urmia Lake

向作者/读者索取更多资源

Salinity gradient has globally high potential for electric energy production, especially where low salinity rivers discharge into hyper-saline lakes. Lake Urmia is world's second hyper-saline lake, with a number of low salinity rivers discharging into the lake, the most significant of which is ZarrinehRud River. Based on thermodynamic calculations and on field data, the theoretical potential of energy production at the above system has been calculated between 400 and 1000 MW, while the technical potential is expected between 40 and 50% of that. Two processes for the production of electricity from salinity gradients were investigated: PRO and RED. The revenue of such attempt is a function of membrane cost, power density, lifetime expectation and sale price of electric power. Based on the available technology, the project is expected to be viable if membranes with power density above 5 W/m(2) and 10 years lifetime expectancy or 10 W/m(2) and 5 years lifetime expectancy will be used. The cost of membranes for a 25 MW plant has been estimated between 75 and 150 million USD, while the cost of electric energy from a full-scale PRO plant is expected to be between 65 and 130 USD/MWh (comparable with the cost of electric energy generated from other renewable energy sources). (C) 2015 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据