期刊
RENEWABLE & SUSTAINABLE ENERGY REVIEWS
卷 62, 期 -, 页码 971-987出版社
PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.rser.2016.05.044
关键词
Photovoltaic power plants; Grid support; Grid codes
资金
- National Department of Higher Education, Science, Technology and Innovation of Ecuador (SENESCYT)
The installation of large scale photovoltaic power plants connected at transmission level has increased during the last years. There are some challenges that these power plants have to overcome regarding the operation and control while dealing with the solar energy variability and uncertainty. Today, few countries are aware of the importance of this source of energy as part of the utility system and how it can affect the operability. Thus, this paper discusses about the trend of large scale photovoltaic power plants around the world and the importance of the development of grid codes for its integration. Then, the paper addresses a comparison of the grid codes of Germany, US, Puerto Rico, Romania, China and South Africa considering: fault ride through capability, frequency and voltage regulation, as well as active and reactive power support. In addition, a broad discussion about the challenges that the large scale photovoltaic power plants have to overcome is presented together with the compliance technology and future trend. (C) 2016 Elsevier Ltd. All rights reserved.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据