4.7 Article

A delay time model for a mission-based system subject to periodic and random inspection and postponed replacement

期刊

RELIABILITY ENGINEERING & SYSTEM SAFETY
卷 150, 期 -, 页码 96-104

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.ress.2016.01.016

关键词

Maintenance modeling; Delay time; Periodic and random inspection; Postponed replacement; Expected cost per unit time

资金

  1. National Natural Science Foundation of China [61104133, 61473014]

向作者/读者索取更多资源

We propose an inspection and replacement policy for a single component system that successively executes missions with random durations. The failure process of the system can be divided into two states, namely, normal and defective, following the delay time concept. Inspections are carried out periodically and immediately after the completion of each mission (random inspections). The failed state is always identified immediately, whereas the defective state can only be revealed by an inspection. If the system fails or is defective at a periodic inspection, then replacement is immediate. If, however, the system is defective at a random inspection, then replacement will be postponed if the time to the subsequent periodic inspection is shorter than a pre-determined threshold, and immediate otherwise. We derive the long run expected cost per unit time and then investigate the optimal periodic inspection interval and postponement threshold. A numerical example is presented to demonstrate the applicability of the proposed maintenance policy. (C) 2016 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据