4.3 Article

Capital-constrained maintenance scheduling for road networks considering traffic dynamics

期刊

TRANSPORTMETRICA B-TRANSPORT DYNAMICS
卷 11, 期 1, 页码 1845-1870

出版社

TAYLOR & FRANCIS LTD
DOI: 10.1080/21680566.2023.2250080

关键词

Maintenance scheduling; road network; bi-objective optimization; day-to-day dynamics; NSGA II

向作者/读者索取更多资源

This study proposes a bi-objective mixed integer programming model that considers the capital constraints in road network maintenance scheduling. A link-based day-to-day dynamics model is developed to simulate the transient fluctuation in traffic flows, and a nondominated sorting genetic algorithm-II (NSGA-II) is used to solve the bi-objective model and generate optimal Pareto solutions. The TOPSIS method is then adopted to determine the best compromise solution.
Road network maintenance scheduling mainly considers budget limits in the previous studies and largely ignores the capital constraints. This study proposes a bi-objective mixed integer programming model, in which the net present value (NPV) is maximized and the increased total system travel time (ITSTT) due to maintenance activities under the capital constraints is minimized. Since the road network flows cannot reach an equilibrium state overnight due to the variation of network capacity, a link-based day-to-day dynamics model is developed to simulate the transient fluctuation in the traffic flows and calculate the total system travel time of each day. The bi-objective model is solved by the nondominated sorting genetic algorithm-II (NSGA-II) that generates a set of optimal Pareto solutions. The TOPSIS method is then adopted to determine the best compromise solution. Finally, a case study is conducted to demonstrate the effects of key parameters on the values of the two objectives.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.3
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据