Optimal Management of Seasonal Pumped Hydro Storage System for Peak Shaving

期刊

SUSTAINABILITY
卷 15, 期 15, 页码 -

出版社

MDPI
DOI: 10.3390/su151511973

关键词

optimal management; optimization; pumped hydro storage; renewable energy resources

向作者/读者索取更多资源

Power demand fluctuates daily and seasonally. Managing this variation is challenging for energy suppliers as it increases the cost of electricity due to the operation of expensive power plants during high-demand seasons. Peak load shaving aims to reduce peak load and shift it to times of lower demand, necessitating large-scale and long-term energy storage systems. In this study, an energy management system (EMS) is developed to optimize the operation of a grid-connected pumped hydro storage (PHS) for peak shaving. The simulation results show that integrating PHS significantly reduces the operation of expensive thermal units and decreases operating costs.
Power demand varies on a daily and seasonal basis. Responding to changing demands over time is challenging for energy suppliers as it causes expensive power plants to operate in high-demand seasons, usually summer, increasing the cost of electricity. Peak load shaving makes the load curve flatten by reducing the peak load and shifting it to times of lower demand, hence reducing the operation of expensive power plants. Hence, there is a need for large-scale and long-term ESS to store energy in the time of low-demand seasons for future utilization in the highest-demand ones. In this work, an energy management system (EMS) is developed to optimally manage a grid-connected pumped hydro storage (PHS) for peak shaving. The proposed model incorporates a dynamic economic dispatch (DED) over a study period of one year; hence, a DC power flow analysis considering transmission constraints is utilized to ensure a fast load flow estimation and a manageable simulation time. The framework can be adopted to assess the long-term profitability of PHS-utilizing GAMS as an optimization tool. Further, to draw conclusions that would suit the characteristics of the demand pattern. This analysis is essential to motivate the construction of new seasonal PHS plants due to the high construction costs they are identified with, especially in geographical areas where this technology is not yet considered or is hard to construct. The simulation results demonstrate that integrating 1500 MWh PHS reduced the operation of expensive thermal units by 1224 MWh annually. Further, a reduction in operation costs was recorded after integrating a PHS unit that ranged from 2.6 M to 22 M USD/year, depending on the storage capacity.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据