4.3 Article

First to signal criterion for comparing control chart performance

期刊

QUALITY ENGINEERING
卷 -, 期 -, 页码 -

出版社

TAYLOR & FRANCIS INC
DOI: 10.1080/08982112.2023.2223690

关键词

Average run length; CUSUM chart; EWMA chart; statistical process monitoring; >

向作者/读者索取更多资源

Control chart performance is often measured using average run length or median run length. However, these measures do not indicate which method is more likely to signal first. We introduce the idea of "first to signal" to compare different charts based on this criterion.
Control chart performance is often measured using average run length or median run length, which gives the expected or median number of samples to signal. It is often argued that on average, one chart will signal a process change quicker than another, and is therefore a better choice. Average and median run length do not, however, answer the question of which method will be more likely to signal first. We introduce the idea of first to signal and compare charts based on this criterion.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.3
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据