Technologies for large cross-section subsea tunnel construction using drilling and blasting method

期刊

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.tust.2023.105161

关键词

Subsea tunnel; Water inrush; Compound grouting; Ground deformation control; Active controlling waterproof-drainage system

向作者/读者索取更多资源

This paper reviews the progress made by our research team in constructing large cross-section subsea tunnels using the drilling and blasting method. It introduces our research on water prevention and control during construction, as well as water leakage and discharge control during operation. The achievements of our research were applied to two large cross-section subsea tunnels in China, establishing a technical mode for safe construction under complex conditions.
This paper reviews the progress made by our research team in the construction of large cross-section subsea tunnels using the drilling and blasting method. Our research on the prevention and control of water inrush during the construction period and the control of water leakage and discharge during the operational period is intro- duced. It includes a compound grouting technology for high permeable ground, an elaborate process control method for large cross-section tunnels and an active controlling waterproof-drainage system. These achievements were applied to the first two large cross-section subsea tunnels in China, namely the Xiamen Xiang'an Tunnel and the Qingdao Jiaozhou Bay Tunnel. Thereafter, the technical mode of subsea tunnel construction using the drilling and blasting method was established, providing a theoretical basis and systematic technical support for the safe construction of large cross-section subsea tunnels under complex conditions.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据