This study investigates the use of a combined transition system consisting of an approach slab and additional rails to improve the geometrical and mechanical defects of railway lines. Experimental tests and numerical simulations show that this transition system achieves a smooth stiffness transition between slab track and ballasted track.
Abrupt stiffness variations along the railway track may increase the geometrical and mechanical defects of railway lines. The conjunction points of a railway track with concrete and ballast pavements, which are called slab-ballasted track transitions, are one of the main areas where vertical track stiffness changes sharply. Therefore, the potential benefits of a combined transition system along the slab-ballasted transition, made of an approach slab and additional rails, are studied in this paper. For this purpose, a vehicle-track-substructure interaction model, which included three main segments of the railway track (slab track, transition zone, and ballasted track) was programmed based on the finite element method. A test line with the mentioned combined transition system was built to measure the railway track responses through field study. Then, the three-dimensional (3D) numerical model was validated using the results obtained from the experimental tests. Afterwards, a number of parametric studies were performed to analyze the dynamic responses of the combined transition zone. The results indicated that this type of transition system promotes a smoother stiffness transition between the slab track segment and the ballasted track segment by making the transition in three gradual steps. The track displacements in the analyzed case-study gradually increased by about 22%, 28%, and 34% along the combined transition zone in the junction points of the slab and ballasted tracks.