相关参考文献
注意:仅列出部分参考文献,下载原文获取全部文献信息。An optimization model for construction project scheduling by considering CO2 emissions with multi-mode resource constraints under interval-valued fuzzy uncertainty
S. Aramesh et al.
INTERNATIONAL JOURNAL OF ENVIRONMENTAL SCIENCE AND TECHNOLOGY (2023)
A new approach for production project scheduling with time-cost-quality trade-off considering multi-mode resource-constraints under interval uncertainty
M. Ghasemi et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2023)
Multi-Objective multi-skill resource-constrained project scheduling problem with skill switches: Model and evolutionary approaches
Yuan Tian et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2022)
Multi-skill resource constrained project scheduling using a multi-objective discrete Jaya algorithm
Yang-Yuan Li et al.
APPLIED INTELLIGENCE (2022)
An efficient hybrid integer and categorical particle swarm optimization algorithm for the multi-mode multi-project inverse scheduling problem in turbine assembly workshop
Yahui Zhang et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2022)
A robust optimization approach for the multi-mode resource-constrained project scheduling problem
Noemie Balouka et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2021)
On the sustainable perishable food supply chain network design: A dairy products case to achieve sustainable development goals
Javid Jouzdani et al.
JOURNAL OF CLEANER PRODUCTION (2021)
Multi-Objective Multi-Skill Resource-Constrained Project Scheduling Problem Under Time Uncertainty
Arman Ghamginzadeh et al.
INTERNATIONAL JOURNAL OF FUZZY SYSTEMS (2021)
An integrated sustainable medical supply chain network during COVID-19
Fariba Goodarzian et al.
ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE (2021)
Multi-mode resource-constrained project scheduling with uncertain activity cost
Fang Xie et al.
EXPERT SYSTEMS WITH APPLICATIONS (2021)
Post-disaster reconstruction supply chain: Empirical optimization study
Mahsa Zokaee et al.
AUTOMATION IN CONSTRUCTION (2021)
An interval-stochastic programming based approach for a fully uncertain multi-objective and multi-mode resource investment project scheduling problem with an application to ERP project implementation
Kemal Subulan
EXPERT SYSTEMS WITH APPLICATIONS (2020)
A new approach to generate pattern-efficient sets of non-dominated vectors for multi-objective optimization
Bogdana Stanojevic et al.
INFORMATION SCIENCES (2020)
A new interval type-2 fuzzy approach for multi-scenario project cash flow assessment based on alternative queuing method and dependency structure matrix with a case study
Seyed Ali Mirnezami et al.
ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE (2020)
Improved selection in evolutionary multi-objective optimization of multi-skill resource-constrained project scheduling problem
Maciej Laszczyk et al.
INFORMATION SCIENCES (2019)
Two continuous-time assignment-based models for the multi-mode resource-constrained project scheduling problem
Mario Gnaegi et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2019)
Evolutionary algorithms for multi-objective dual-resource constrained flexible job-shop scheduling problem
M. Yazdani et al.
OPSEARCH (2019)
Simultaneous selection of material and supplier under uncertainty in carton box industries: a fuzzy possibilistic multi-criteria approach
Sam Mosallaeipour et al.
SOFT COMPUTING (2018)
An Effective Solution Approach to Fuzzy Programming with Application to Project Scheduling
Qianyu Zhang et al.
INTERNATIONAL JOURNAL OF FUZZY SYSTEMS (2018)
A multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problem
Martin Josef Geiger
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2017)
Developing Talent from a Supply-Demand Perspective: An Optimization Model for Managers
Hadi Moheb-Alizadeh et al.
LOGISTICS-BASEL (2017)
Multi-skilled project scheduling with level-dependent rework risk; three multi-objective mechanisms based on cuckoo search
Hamidreza Maghsoudlou et al.
APPLIED SOFT COMPUTING (2017)
An interactive fuzzy programming approach for bi-objective straight and U-shaped assembly line balancing problem
M. H. Alavidoost et al.
APPLIED SOFT COMPUTING (2016)
A multi-objective invasive weeds optimization algorithm for solving multi-skill multi-mode resource constrained project scheduling problem
Hamidreza Maghsoudlou et al.
COMPUTERS & CHEMICAL ENGINEERING (2016)
Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars
Stefan Kreter et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2016)
Construction Site Layout Planning Problem Using Two New Meta-heuristic Algorithms
A. Kaveh et al.
IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING (2016)
A dispatching rule-based genetic algorithm for multi-objective job shop scheduling using fuzzy satisfaction levels
Jing Huang et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2015)
Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting
Junzilan Cheng et al.
COMPUTERS & OPERATIONS RESEARCH (2015)
Bi-Objective Multi-Mode Project Scheduling Under Risk Aversion
Walter J. Gutjahr
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2015)
Quantifying the risk of project delays with a genetic algorithm
Jeremy Pfeifer et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2015)
Resource constrained project scheduling problem with setup times after preemptive processes
Behrouz Afshar-Nadjafi et al.
COMPUTERS & CHEMICAL ENGINEERING (2014)
An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances
Vincent Van Peteghem et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2014)
Solving a multi-objective chance-constrained hub covering location problem by discrete invasive weed optimization
Seyed Hossein Nikokalam-Mozafar et al.
COGENT ENGINEERING (2014)
Solving a multi-objective multi-skilled manpower scheduling model by a fuzzy goal programming approach
Parisa Shahnazari-Shahrezaei et al.
APPLIED MATHEMATICAL MODELLING (2013)
Ant colony optimization-based multi-mode scheduling under renewable and nonrenewable resource constraints
Heng Li et al.
AUTOMATION IN CONSTRUCTION (2013)
Multi-mode resource-constrained discrete time-cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm
Parviz Ghoddousi et al.
AUTOMATION IN CONSTRUCTION (2013)
Project scheduling under uncertainty using fuzzy modelling and solving techniques
Malek Masmoudi et al.
ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE (2013)
Reliable design of a closed loop supply chain network under uncertainty: An interval fuzzy possibilistic chance-constrained model
Behnam Vahdani et al.
ENGINEERING OPTIMIZATION (2013)
A differential evolution algorithm to solve multi-skilled project portfolio scheduling problems
H. Kazemipoor et al.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2013)
MILP formulations for single- and multi-mode resource-constrained project scheduling problems
Thomas S. Kyriakidis et al.
COMPUTERS & CHEMICAL ENGINEERING (2012)
Time and work generalised precedence relationships in project scheduling with pre-emption: An application to the management of Service Centres
Sacramento Quintanilla et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2012)
Fuzzy resource-constrained project scheduling using taboo search algorithm
Omer Atli et al.
INTERNATIONAL JOURNAL OF INTELLIGENT SYSTEMS (2012)
An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem
Ling Wang et al.
INFORMATION SCIENCES (2011)
A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem
Vincent Van Peteghem et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2010)
Expensive Multiobjective Optimization by MOEA/D With Gaussian Process Model
Qingfu Zhang et al.
IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION (2010)
A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling
Hedi Chtourou et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2008)
Pre-emption in resource-constrained project scheduling
Francisco Ballestin et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2008)
A project scheduling problem with labour constraints and time-dependent activities requirements
L. -E. Drezet et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2008)
A supply chain distribution network design model: An interactive fuzzy goal programming-based solution approach
Hasan Selim et al.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2008)
Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting
Jirachai Buddhakulsomsiri et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2006)
Project scheduling under uncertainty: Survey and research potentials
W Herroelen et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2005)
Robust and reactive project scheduling: a review and classification of procedures
W Herroelen et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2004)
A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags
R Heilmann
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2003)
A Bayesian approach to a dynamic inventory model under an unknown demand distribution
KR Kamath et al.
COMPUTERS & OPERATIONS RESEARCH (2002)
An integrated survey of deterministic project scheduling
R Kolisch et al.
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE (2001)