Mechanism and Control of Asymmetric Floor Heave in the Gob-Side Coal Roadway under Mining Pressure in Extra-Thick Coal Seams

期刊

ENERGIES
卷 16, 期 13, 页码 -

出版社

MDPI
DOI: 10.3390/en16134948

关键词

mining pressures; gob-side coal roadway; asymmetric floor heave; failure mechanism; cooperative control

向作者/读者索取更多资源

Through methods such as on-site research, theoretical analysis, numerical simulation, and industrial experiment, the mechanism of asymmetric floor heave in a gob-side coal roadway affected by mining pressure during the mining of extra-thick coal seams is researched. The main findings are: the roadway floor shows asymmetry, indicating that the floor displacement near the coal pillar side is relatively large; the cause of the asymmetric floor heave is an uneven distribution of vertical stress; and a control scheme of floor leveling + anchor cable support + concrete hardening is proposed.
Due to their tense mining succession relationship, gob-side roadways may undergo significant deformation under multi-mining pressure. In this article, many methods, such as on-site research, a theoretical analysis, a numerical simulation and an industrial experiment, are used to research the mechanism of asymmetric floor heave in a gob-side coal roadway affected by mining pressure during the mining of extra-thick coal seams. Our main research is as follows: (1) By monitoring the floor deformation in the roadway on site, it is concluded that the roadway floor shows asymmetry, indicating that the floor displacement near the coal pillar side is relatively large. (2) Based on a lateral overburden structure model of the roadway, the calculation formulas of the horizontal vertical stress caused by the roadway excavation and the excavation of the upper working face are derived separately, and the vertical stress coupling curves on both sides of the roadway during the mining of the upper working face are obtained through a numerical simulation. It is concluded that the cause of the asymmetric floor heave in the roadway is an uneven distribution of vertical stress. (3) The numerical simulation shows a symmetrical distribution of the floor displacement curve during the roadway excavation with a max. displacement of 49.5 mm. The floor displacement curve during the mining of the upper working face is asymmetric with a max. displacement of 873 mm at a distance of 1 m from the central axis near the coal pillar side. The range of the plastic zone in the roadway gradually expands with the mining of the upper working face, and the maximum depth of floor failure is 5.5 m. (4) According to the cooperative control principle of roof + two sides + floor, an asymmetric floor heave joint control scheme of floor leveling + anchor cable support + concrete hardening is proposed. The floor deformation monitoring results indicate that the max. floor heave at the measurement point near the coal pillar in the roadway is 167 mm, and the floor heave is effectively controlled.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据