4.6 Article

Effect of Crude Oil and Nitrogen Gas Flow Rates on the Time Taken for Flow Initiation of Waxy Crude Oil

期刊

PROCESSES
卷 11, 期 5, 页码 -

出版社

MDPI
DOI: 10.3390/pr11051414

关键词

wax deposition; waxy crude flow loop; nitrogen gas; flow initiation

向作者/读者索取更多资源

Transportation of waxy crude oil often faces flow assurance issues, such as wax deposition, which leads to operational complexity during pipeline restart after shutdown. This study investigates the effect of crude oil and nitrogen gas flow rates on the time taken for crude oil flow initiation. Results show that the presence of nitrogen gas improved pipeline restart phase by reducing both restart pressure and flow initiation time.
Transportation of waxy crude oil in a production pipeline often encountered flow assurance issues, such as wax deposition. In a case where pipeline shutdown is needed, wax deposit is likely to form within the pipelines, which leads to operational complexity during the restart phase. Commonly, crude oil restarts to flow after a significantly high restart pressure is pumped longer than is necessary. This is due to the physical hindrance caused by the solid wax, which requires additional pressure to disintegrate it before achieving a steady crude oil flow. This study aims to investigate the effect of crude oil and nitrogen gas flow rates on the time taken for crude oil flow initiation using a flow loop rig, which is connected to a nitrogen gas injection system. The nitrogen gas was injected into the test section pipeline at predetermined flow rates within specified periods. After 45 min of static cooling, the crude oil gear pump is switched on to build sufficient pressure to initiate the waxy crude oil flow in the pipeline. Additionally, a statistical analysis by the response surface methodology was also performed by Minitab((R)) 19 software. Results show that the maximum reduction in flow initiation is 73.7% at 5 L/min of crude oil and 1 L/min of nitrogen gas. This study reveals that the presence of nitrogen gas improved the pipeline restart phase by minimizing both restart pressure and time taken for flow initiation.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据