4.3 Article

Collaborative optimization of rescue operation and timetable rescheduling under metro train failure

期刊

出版社

TAYLOR & FRANCIS LTD
DOI: 10.1080/21680566.2023.2203847

关键词

Urban rail transit; train failures; rescue operations; timetable rescheduling; additional train

向作者/读者索取更多资源

This paper proposes a collaborative model to optimize train rescue operations and timetable rescheduling. The model includes various strategies such as retiming, train cancellation, skip-stopping, and inserting additional trains. The objective is to minimize the duration of train rescue and the number of stranded passengers. The results show that the proposed method reduces the number of stranded passengers by 28.6% at a slight increase in train rescue duration compared to the sequential method. Moreover, inserting additional trains and skip-stopping are found to be effective in improving service quality during disruptions.
Train failures may lead to disruptions of train operations and degradation of the service quality. This situation requires a quick turnaround to rescue the disabled train and reschedule the timetable. This paper proposes a collaborative model to optimise train rescue operations and timetable rescheduling, which includes retiming, cancelling trains, skip-stopping, and inserting additional trains. The model objective is to minimise train rescue duration and the number of stranded passengers. A tabu search algorithm combined with solver GUROBI is designed to solve the model. Case studies show that the proposed method reduces the number of stranded passengers by 28.6% at the cost of 5% increment of train rescue duration compared to the sequential method which finds the rescue operations first and then reschedules the train timetable. Moreover, the results indicate that inserting additional trains and skip-stopping are effective in improving service quality during disruptions.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.3
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据