Multiobjective Flexible Job-Shop Rescheduling With New Job Insertion and Machine Preventive Maintenance

期刊

IEEE TRANSACTIONS ON CYBERNETICS
卷 53, 期 5, 页码 3101-3113

出版社

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TCYB.2022.3151855

关键词

Maintenance engineering; Production; Job shop scheduling; Optimization; Electric breakdown; Dynamic scheduling; Adaptation models; Flexible job-shop rescheduling; machine preventive maintenance (PM); multiobjective evolutionary algorithm (MOEA); new job insertion

向作者/读者索取更多资源

In this study, a flexible job-shop rescheduling problem with new job insertion and machine preventive maintenance is investigated. An imperfect PM model is established to determine the optimal maintenance plan for each machine, and a multiobjective optimization model is developed to jointly optimize production scheduling and maintenance planning. An improved nondominated sorting genetic algorithm III with adaptive reference vector is proposed to solve the model, and its effectiveness is demonstrated through numerical simulation experiments.
In the actual production, the insertion of new job and machine preventive maintenance (PM) are very common phenomena. Under these situations, a flexible job-shop rescheduling problem (FJRP) with both new job insertion and machine PM is investigated. First, an imperfect PM (IPM) model is established to determine the optimal maintenance plan for each machine, and the optimality is proven. Second, in order to jointly optimize the production scheduling and maintenance planning, a multiobjective optimization model is developed. Third, to deal with this model, an improved nondominated sorting genetic algorithm III with adaptive reference vector (NSGA-III/ARV) is proposed, in which a hybrid initialization method is designed to obtain a high-quality initial population and a critical-path-based local search (LS) mechanism is constructed to accelerate the convergence speed of the algorithm. In the numerical simulation, the effect of parameter setting on the NSGA-III/ARV is investigated by the Taguchi experimental design. After that, the superiority of the improved operators and the overall performance of the proposed algorithm are demonstrated. Next, the comparison of two IPM models is carried out, which verifies the effectiveness of the designed IPM model. Last but not least, we have analyzed the impact of different maintenance effects on both the optimal maintenance decisions and integrated maintenance-production scheduling schemes.