相关参考文献
注意:仅列出部分参考文献,下载原文获取全部文献信息。A generic optimization framework for scheduling problems under machine deterioration and maintenance activities
Radoslaw Rudek
COMPUTERS & INDUSTRIAL ENGINEERING (2022)
Preventive maintenance scheduling optimization based on opportunistic production-maintenance synchronization
Li Li et al.
JOURNAL OF INTELLIGENT MANUFACTURING (2021)
A novel multi-objective optimization algorithm for the integrated scheduling of flexible job shops considering preventive maintenance activities and transportation processes
Hui Wang et al.
SOFT COMPUTING (2021)
Greedy randomized adaptive search procedure for simultaneous scheduling of production and preventive maintenance activities in dynamic flexible job shops
Adil Baykasoglu et al.
SOFT COMPUTING (2021)
Permutation flowshop scheduling with periodic maintenance and makespan objective
Paz Perez-Gonzalez et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2020)
A research survey: heuristic approaches for solving multi objective flexible job shop problems
Alper Turkyilmaz et al.
JOURNAL OF INTELLIGENT MANUFACTURING (2020)
Solving the multi-objective flexible job shop scheduling problem with a novel parallel branch and bound algorithm
Carlos Soto et al.
SWARM AND EVOLUTIONARY COMPUTATION (2020)
Single-machine-based joint optimization of predictive maintenance planning and production scheduling
Qinming Liu et al.
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING (2018)
A novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem: simulation-based optimization approach
Seyed Habib A. Rahmati et al.
ANNALS OF OPERATIONS RESEARCH (2018)
Robustness measures and robust scheduling for multi-objective stochastic flexible job shop scheduling problems
Xiao-Ning Shen et al.
SOFT COMPUTING (2017)
Flexible job shop scheduling under condition-based maintenance: Improved version of imperialist competitive algorithm
M. Zandieh et al.
APPLIED SOFT COMPUTING (2017)
An energy-efficient multi-objective optimization for flexible job-shop scheduling problem
Hadi Mokhtari et al.
COMPUTERS & CHEMICAL ENGINEERING (2017)
Distributed maintenance planning in manufacturing industries
Kartikeya Upasani et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2017)
A research survey: review of flexible job shop scheduling techniques
Imran Ali Chaudhry et al.
INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH (2016)
Joint optimization of production scheduling and machine group preventive maintenance
Lei Xiao et al.
RELIABILITY ENGINEERING & SYSTEM SAFETY (2016)
Preventive maintenance opportunities for large production systems
Jun Ni et al.
CIRP ANNALS-MANUFACTURING TECHNOLOGY (2015)
Scheduling optimisation of a real flexible job shop including fixture availability and preventive maintenance
Karin Thornblad et al.
EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING (2015)
A New Heuristic Method for Solving Joint Job Shop Scheduling of Production and Maintenance
N. Fnaiech et al.
IFAC PAPERSONLINE (2015)
A discrete artificial bee colony algorithm for the multi-objective flexible job-shop scheduling problem with maintenance activities
Jun-Qing Li et al.
APPLIED MATHEMATICAL MODELLING (2014)
Robust scheduling for multi-objective flexible job-shop problems with random machine breakdowns
Jian Xiong et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2013)
Mathematical modelling and a meta-heuristic for flexible job shop scheduling
V. Roshanaei et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2013)
Life cycle oriented evaluation of flexibility in investment decisions for automated assembly systems
Achim Kampker et al.
CIRP JOURNAL OF MANUFACTURING SCIENCE AND TECHNOLOGY (2013)
Chemical-reaction optimization for flexible job-shop scheduling problems with maintenance activity
Jun-qing Li et al.
APPLIED SOFT COMPUTING (2012)
Two meta-heuristic algorithms for solving multi-objective flexible job-shop scheduling with parallel machine and maintenance constraints
Vahid Majazi Dalfard et al.
COMPUTERS & MATHEMATICS WITH APPLICATIONS (2012)
Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem
E. Moradi et al.
EXPERT SYSTEMS WITH APPLICATIONS (2011)
A GRASP algorithm for flexible job-shop scheduling problem with limited resource constraints
M. Rajkumar et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2011)
Simultaneous scheduling of production and maintenance tasks in the job shop
M. Ben Ali et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2011)
A survey of scheduling with deterministic machine availability constraints
Ying Ma et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2010)
An effective heuristic for flexible job-shop scheduling problem with maintenance activities
Shijin Wang et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2010)
An efficient architecture for scheduling flexible job-shop with machine availability constraints
E. Moradi et al.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2010)
A GRASP algorithm for flexible job-shop scheduling with maintenance constraints
M. Rajkumar et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2010)
Bi-objective optimization algorithms for joint production and maintenance scheduling: application to the parallel machine problem
A. Berrichi et al.
JOURNAL OF INTELLIGENT MANUFACTURING (2009)
Fifty years of scheduling: a survey of milestones
C. N. Potts et al.
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY (2009)
Minimizing the makespan for the MPM job-shop with availability constraints
N. Zribi et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2008)
Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm
Jie Gao et al.
JOURNAL OF INTELLIGENT MANUFACTURING (2006)
Flexible and reconfigurable manufacturing systems paradigms
Hoda A. ElMaraghy
INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS (2005)
An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems
WJ Xia et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2005)
Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems
I Kacem et al.
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART C-APPLICATIONS AND REVIEWS (2002)
Evaluation and comparison of production schedules
K Kempf et al.
COMPUTERS IN INDUSTRY (2000)
Scheduling with limited machine availability
G Schmidt
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2000)