期刊
WASTE MANAGEMENT
卷 154, 期 -, 页码 223-231出版社
PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.wasman.2022.10.011
关键词
Shredder fines; Valorisation; Material upgrading; Resource recovery; Recycling
This study aimed to assess the environmental potential of shredder fines and propose three resource recovery strategies. The results suggest that Alternative 1 and Alternative 3 are preferable over Alternative 2 in the context of Sweden, with some environmental hot spots identified.
Millions of tonnes of shredder fines are disposed of annually across the world. In Sweden, fines are primarily utilised in landfill covering. Given the decreasing landfilling and the increasing environmental concerns, the valorisation of this residue is becoming ever important. In order to guide sustainable investment decisions and governance of fines valorisation, this study aimed to assess the environmental potential of different valorisation alternatives. In doing so, three conceptual valorisation process schemes were formulated together with the shredding industry, each based on principally different resource recovery strategies: 1) maximising copper re-covery, 2) maximising construction aggregates recovery, and 3) optimising full resource recovery. A streamlined life cycle assessment (LCA) of these valorisation alternatives was performed in relation to the impact categories of climate change, ozone depletion, acidification, and resource depletion. The results of this study generally suggest that in the context of Sweden, Alternatives 1 and 3 are preferable over Alternative 2 regarding all the impact categories. There, Alternative 3 is more preferable regarding climate change, while Alternative 1 is preferable regarding the other impact categories. Several environmental hot spots occur along the different life cycle stages of the fines-derived secondary raw materials. The Monte Carlo simulation of the parameter un-certainties generally confirms the overall LCA findings.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐