相关参考文献
注意:仅列出部分参考文献,下载原文获取全部文献信息。Seismic Parameters of Mining-Induced Aftershock Sequences for Re-entry Protocol Development
Javier A. Vallejos et al.
PURE AND APPLIED GEOPHYSICS (2018)
Evaluation of rock bursting phenomena in a tunnel in the Himalayas
K. K. Panthi
BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT (2012)
Correlations between mining and seismicity for re-entry protocol development
J. A. Vallejos et al.
INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES (2011)
Key technologies for construction of Jinping traffic tunnel with an extremely deep overburden and a high water pressure
Shougen Chen et al.
JOURNAL OF MODERN TRANSPORTATION (2011)
Management of rock bursts during excavation of the deep tunnels in Jinping II Hydropower Station
Zhi-gang Shan et al.
BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT (2010)
Preliminary engineering application of microseismic monitoring technique to rockburst prediction in tunneling of Jinping II project
Chun'an Tang et al.
JOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERING (2010)
Assessing the quality of earthquake catalogues: Estimating the magnitude of completeness and its uncertainty
J Woessner et al.
BULLETIN OF THE SEISMOLOGICAL SOCIETY OF AMERICA (2005)
Stress measurements from oriented core
E Villaescusa et al.
INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES (2002)
Minimum magnitude of completeness in earthquake catalogs: Examples from Alaska, the western United States, and Japan
S Wiemer et al.
BULLETIN OF THE SEISMOLOGICAL SOCIETY OF AMERICA (2000)