4.7 Article

Optimizing resource allocations to improve system reliability via the propagation of statistical moments through fault trees

期刊

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.ress.2022.108873

关键词

Fault tree analysis; Uncertainty propagation; Statistical moments; Resource allocation; Constrained optimization

向作者/读者索取更多资源

Fault tree analysis is an important method for modeling and analyzing reliability and failure modes. This paper proposes a new approach of framing the model parameters as random variables to estimate the probability of the top failure event. An uncertainty propagation method using statistical moments is developed for both static and dynamic gates, considering the effects of dependency conditions for different distribution types. By identifying the best set of model parameters within a constrained budget, the uncertainty in the top failure event can be minimized. This optimization is demonstrated through a case study.
Fault tree analysis remains a significant alternative for modeling and analyzing reliability and failure modes. Traditionally, the probabilities of the basic events are assumed as point estimates from which the fault tree is used to estimate the probability of the top failure event. This paper instead proposes using this framework for a different purpose: framing the model parameters describing the basic events as random variables, which collectively contribute to the statistics of the estimate of the top failure event. An approach for uncertainty propagation via statistical moments is developed for both static and dynamic gates with specific consideration of the effects of the dependency conditions for different distribution types. Assuming there is a cost to acquire model parameters with reduced uncertainty, this framing can thus be used to identify the best set of model parameters possible within a constrained budget to minimize uncertainty in the resulting estimate of the top failure event. With these models in place, the statistical moments of the top event can be connected to all lower levels, and the statistics in the estimate of the top event can be optimized with a given cost constraint (e.g. allocating resources to reducing uncertainty in the knowledge of basic events to minimize variance in the estimate of the top failure event). This optimization of the uncertainty in the top event is demonstrated with a case study.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据