4.5 Article

A complex spherical fuzzy CRADIS method based Fine-Kinney framework for occupational risk evaluation in natural gas pipeline construction

期刊

GEOENERGY SCIENCE AND ENGINEERING
卷 220, 期 -, 页码 -

出版社

ELSEVIER
DOI: 10.1016/j.petrol.2022.111246

关键词

Pipeline construction; Complex spherical fuzzy set; Risk prioritization; CRADIS method; Fine -Kinney

向作者/读者索取更多资源

This article introduces a comprehensive Fine-Kinney framework to handle occupational risk evaluation in the natural gas pipeline construction project. The framework, based on complex spherical fuzzy environment, combines the compromise ranking of alternatives from distance to ideal solution method and the prioritized weighted average operator for complex spherical fuzzy numbers. The stability and rationality of the framework are investigated through sensitivity analysis, and a comparative study is conducted to demonstrate its advantages over existing similar frameworks. The results show that the framework is able to effectively identify the most serious occupational risk.
Occupational risk evaluation is one of the most indispensable issues in the risk prevention and control process for the natural gas pipeline construction (NGPC) project. The Fine-Kinney model, recognized as an effective occu-pational risk evaluation technique, has limited capability to handle the occupational risk analysis problem under the complex spherical fuzzy (CSF) environment. Accordingly, a synthetical Fine-Kinney framework based on the compromise ranking of alternatives from distance to ideal solution (CRADIS) method is developed to overcome these downsides of occupation risk analysis in the NGPC project within the CSF context. A prioritized weighted average (PWA) operator for complex spherical fuzzy numbers (CSFNs) is incorporated into the group risk evaluation matrix generation process, which can take the priority degrees of experts into account. Then, the extended CRADIS method-based Fine-Kinney framework is generated, in which the Choquet integral for CSFNs is incorporated to reflect the impact of interactive risk factors. Next, the detailed solution procedures of the framework for handling the occupational risk evaluation problem are presented. Finally, the described frame-work is employed as an empirical example of occupational risk analysis for the NGPC project to demonstrate its feasibility in practice. After that, a sensitivity analysis of the parameter is investigated to testify to the stability and rationality of the reported synthetical Fine-Kinney framework. Subsequently, to further display the advan-tages of the developed Fine-Kinney framework, a comparative study is implemented to discuss the evaluation result of occupational risk derived from the proposed framework and those of the existing similar Fine-Kinney frameworks. The analysis results indicate that the occupational risk (attack by human or animal) with the maximum risk priority value (1.000) using the framework is identified as the most serious risk for the NGPC project.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据