4.3 Article

Human reliability analysis in deep excavation projects using a fuzzy Bayesian HEART-5M integrated method: case of a residential tower in north Tehran

出版社

TAYLOR & FRANCIS LTD
DOI: 10.1080/10803548.2022.2115227

关键词

human reliability analysis; human errors; excavation projects; Bayesian networks; fuzzy logic; HEART method

向作者/读者索取更多资源

This study identified human errors in deep excavation projects using hierarchical task analysis (HTA) and a systematic human error reduction and prediction approach (SHERPA). The fuzzy Bayesian human error assessment and reduction technique (HEART)-5M method was implemented to determine the human error probability (HEP) for all case-study tasks. Remedial measures were presented for crucial tasks. The suggested approach can serve as a valuable guide for all project stakeholders in identifying, evaluating, and taking corrective actions in similar projects.
Objectives. Numerous labourers lose their lives or suffer from injuries and disabilities yearly due to the lack of safety enforcement in construction projects and accidents caused by excavation collapses. The identification and ranking of human errors have always been a central concern in civil engineering. Previous studies on excavation work and related risks have focused on retaining structure methods, while human errors may be a significant contributor to accidents and near misses. Methods. This study identified human errors in deep excavation projects using hierarchical task analysis (HTA) and a systematic human error reduction and prediction approach (SHERPA). Results. The fuzzy Bayesian human error assessment and reduction technique (HEART)-5M method was implemented to determine the human error probability (HEP) for all case-study tasks. Critical tasks were obtained as 'drainage system execution', 'water and wastewater pipes', 'gas pipes', 'checking cracks in surrounding buildings' and 'checking soil slippage' with probability levels of 0.46, 0.44, 0.44, 0.37 and 0.37, respectively. Finally, remedial measures were presented for crucial tasks. Conclusions. Six unbiased experts approved the model's desirability. The suggested approach can serve as a valuable guide for all project stakeholders in identifying, evaluating and taking corrective actions in similar projects.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.3
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据