4.5 Article

Digital twin oriented multi-objective flexible job shop scheduling model and its hybrid particle swarm optimization

出版社

SAGE PUBLICATIONS LTD
DOI: 10.1177/09544054221121921

关键词

Digital twin; flexible job shop scheduling problem; multi-objective optimization; hybrid particle swarm algorithm; simulated annealing

向作者/读者索取更多资源

This paper proposes a multi-objective flexible job shop scheduling model based on digital twin and designs a hybrid particle swarm optimization method to solve the problem. The obtained Pareto optimal solution set is analyzed to obtain a satisfactory solution. A three-dimensional model is built using Plant Simulation software, and the scheduling process is simulated and optimized by combining with the production data of an enterprise to verify the feasibility and applicability of the method.
To solve the problems of low efficiency and insufficient dynamic response of job shop scheduling in the discrete manufacturing process, a multi-objective flexible job shop scheduling model for digital twin and its solution method are proposed. Firstly, a digital twin scheduling model with physical entity, virtual model and production plan is constructed, and four factors are taken as optimization goals. Then, a hybrid particle swarm optimization method is designed to increase the refined optimization ability, and the obtained Pareto optimal solution set is analyzed by grey relational analysis to obtain a satisfactory solution which coincides with the actual production. Finally, a three-dimensional model which is completely mapped with the real job shop scheduling is built by Plant Simulation software. The scheduling process is simulated and optimized by combining with the production data of an enterprise, which verifies the feasibility and applicability of this method, and will effectively guide the production practice.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据