4.3 Article

Linking BIM Definition, BIM Capability Maturity, and Integrated Project Delivery in the AECO Industry: The Influences of BIM Diffusion and Moral Hazard

期刊

出版社

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)UP.1943-5444.0000839

关键词

Building information modeling (BIM); Integrated project delivery (IPD); Structural equation modeling (SEM); BIM definition; BIM diffusion; Moral hazard; BIM capability maturity

资金

  1. National Social Science Fund: research on the socialized supervision mechanism of market subjects in the engineering construction [17BGL156]

向作者/读者索取更多资源

This study explores the quantitative relationships between BIM definition, BIM capability maturity, integrated project delivery (IPD), BIM diffusion, and moral hazard. The findings reveal the positive association between BIM technology, process, and policy with BIM capability maturity. Additionally, BIM capability maturity has a positive impact on the realization of IPD, which is moderated by BIM diffusion and moral hazard.
Based on an increasing amount of attention paid to explore why building information modeling (BIM) application levels are so low and what are the obstacles that hinder the further application of BIM, a range of existing studies began to explore BIM from different research perspectives. However, these studies only focus on a single perspective to explore this issue in isolation, ignoring the correlation between them. Therefore, by reviewing the hot perspectives of in-depth discussion on this issue in the existing literature, the present study focuses on exploring the quantitative relationships between BIM definition, BIM capability maturity, integrated project delivery (IPD), BIM diffusion, and moral hazard. Structural equation modeling (SEM) was conducted using data from 295 questionnaires to empirically verify our research model. The results show that the perfection of BIM technology, BIM process, and BIM policy have a positive association with BIM capability maturity. In addition, these three factors can be used as mediating variables to affect the relationship between the other two factors and BIM capability maturity. Moreover, BIM capability maturity has a positive impact on the realization of IPD. Specifically, BIM diffusion was found to positively moderate the relationship between BIM capability maturity and the realization of IPD, while moral hazard plays a negatively moderating role. The findings of this research contribute to lay a theoretical foundation for discussing how to improve BIM capability maturity from the perspective of BIM definition, as well as the influence of BIM capability maturity and BIM-related promotion and hindrance factors on IPD, an ideal project transaction model. Understanding these in-depth underlying interrelations can contribute to fully realizing the real implementation of BIM and improve the acceptance of IPD, and ultimately realize the transformation and upgrading of the Architecture, Engineering, Construction, and Operations industry and the construction of smart cities.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.3
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据