Automated Components-Vehicle Allocation Planning for Precast Concrete Projects

相关参考文献

注意:仅列出部分参考文献,下载原文获取全部文献信息。
Article Construction & Building Technology

Generation of stacking plans for prefabricated exterior wall panels shipped vertically with A-frames

Yujin Lee et al.

Summary: To apply prefabricated wall panels to construction projects in a cost-effective manner, reducing logistics costs is crucial. The authors developed a methodology based on the first fit algorithm to help planners generate stacking plans rapidly and systematically. By applying this methodology to two case projects, they found that it can generate stacking plans with lower reshuffling effort and higher panel stability in a fraction of the time compared to conventional practices.

AUTOMATION IN CONSTRUCTION (2021)

Article Engineering, Industrial

Empirical Study of Identifying Logistical Problems in Prefabricated Interior Wall Panel Construction

Yujin Lee et al.

Summary: Off-site prefabrication is increasingly popular in the construction industry for its benefits, but logistical costs remain a major barrier. This study focuses on stacking plans for identifying logistical problems with prefabricated interior wall panels and suggests developing a methodology to generate stacking plans on a Pareto optimal surface to address issues related to unstable stacks and reshuffling effort.

JOURNAL OF MANAGEMENT IN ENGINEERING (2021)

Article Engineering, Industrial

Sources of Uncertainties in Offsite Logistics of Modular Construction for High-Rise Building Projects

Yi Yang et al.

Summary: This study aimed to identify and categorize sources of uncertainties (SoUs) affecting offsite logistics in high-rise modular building projects in high-density cities. Through a multicase study method, 30 key SoUs were identified in five areas, showing that most uncertainties arise from offsite logistics processes and planning and control systems. Demand-side SoUs were found to have higher probabilities and impacts, while supply-side SoUs, although less probable, could have significant impacts on offsite logistics.

JOURNAL OF MANAGEMENT IN ENGINEERING (2021)

Article Engineering, Industrial

Schedule Delay Leading Indicators in Precast Concrete Construction Projects: Qualitative Comparative Analysis of Korean Cases

Kyeongwoon Cho et al.

Summary: This study analyzed 19 precast concrete construction project cases from Korea, identifying the relationship between PC project conditions and schedule delays. Through focus groups, the study further investigated the relationship of BIM with other schedule delay factors. The identified leading indicators of PC project schedule delays can help construction managers mitigate schedule delay risks at an early stage.

JOURNAL OF MANAGEMENT IN ENGINEERING (2021)

Article Construction & Building Technology

Blockchain-based framework for improving supply chain traceability and information sharing in precast construction

Zhaojing Wang et al.

AUTOMATION IN CONSTRUCTION (2020)

Article Engineering, Industrial

Supply Chain Management for Prefabricated Building Projects in Hong Kong

Lizi Luo et al.

JOURNAL OF MANAGEMENT IN ENGINEERING (2020)

Article Engineering, Industrial

Dynamic transportation planning for prefabricated component supply chain

Hong Zhang et al.

ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT (2020)

Article Green & Sustainable Science & Technology

Sustainable Ship Loading Planning for Prefabricated Products in the Construction Industry

Wen Yi et al.

SUSTAINABILITY (2020)

Article Computer Science, Information Systems

Cloud-based fleet management for prefabrication transportation

Gangyan Xu et al.

ENTERPRISE INFORMATION SYSTEMS (2019)

Article Engineering, Industrial

Stakeholder-Associated Supply Chain Risks and Their Interactions in a Prefabricated Building Project in Hong Kong

Lizi Luo et al.

JOURNAL OF MANAGEMENT IN ENGINEERING (2019)

Article Engineering, Industrial

Genetic algorithm for determining the construction logistics of precast components

Yuan Fang et al.

ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT (2019)

Proceedings Paper Engineering, Industrial

Applying the Bi-Level Programming Model Based on Time Satisfaction to Optimize Transportation Scheduling of Prefabricated Components

Xiaoya Tang et al.

PROCEEDINGS OF 2019 8TH INTERNATIONAL CONFERENCE ON INDUSTRIAL TECHNOLOGY AND MANAGEMENT (ICITM 2019) (2019)

Article Construction & Building Technology

Optimal logistics planning for modular construction using two-stage stochastic programming

Pei-Yuan Hsu et al.

AUTOMATION IN CONSTRUCTION (2018)

Article Chemistry, Multidisciplinary

Assessing and Prioritising Delay Factors of Prefabricated Concrete Building Projects in China

Yingbo Ji et al.

APPLIED SCIENCES-BASEL (2018)

Article Construction & Building Technology

Dynamic loading on a prefabricated modular unit of a building during road transportation

Siddhesh Godbole et al.

JOURNAL OF BUILDING ENGINEERING (2018)

Article Computer Science, Interdisciplinary Applications

Improved Precast Production-Scheduling Model Considering the Whole Supply Chain

Zhaojing Wang et al.

JOURNAL OF COMPUTING IN CIVIL ENGINEERING (2017)

Article Construction & Building Technology

Panel Stacking, Panel Sequencing, and Stack Locating in Residential Construction: Lean Approach

John P. Shewchuk et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE (2012)

Article Construction & Building Technology

Developing a precast production management system using RFID technology

Samuel Y. L. Yin et al.

AUTOMATION IN CONSTRUCTION (2009)

Article Construction & Building Technology

Formalization of the flow of component-related information in precast concrete supply chains

Esin Ergen et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2008)

Article Construction & Building Technology

Tracking and locating components in a precast storage yard utilizing radio frequency identification technology and GPS

Esin Ergen et al.

AUTOMATION IN CONSTRUCTION (2007)