相关参考文献
注意:仅列出部分参考文献,下载原文获取全部文献信息。Transformation and Linearization Techniques in Optimization: A State-of-the-Art Survey
Mohammad Asghari et al.
MATHEMATICS (2022)
Planning and control of autonomous mobile robots for intralogistics: Literature review and research agenda
Giuseppe Fragapane et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2021)
The electric vehicle routing problem and its variations: A literature review
Ilker Kucukoglu et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2021)
Scheduling heterogeneous multi-load AGVs with battery constraints
Quang-Vinh Dang et al.
COMPUTERS & OPERATIONS RESEARCH (2021)
Resource management in decentralized industrial Automated Guided Vehicle systems
M. De Ryck et al.
JOURNAL OF MANUFACTURING SYSTEMS (2020)
A New Branch-and-Price-and-Cut Algorithm for One-Dimensional Bin-Packing Problems
Lijun Wei et al.
INFORMS JOURNAL ON COMPUTING (2020)
A Survey on the Electric Vehicle Routing Problem: Variants and Solution Approaches
Tomislav Erdelic et al.
JOURNAL OF ADVANCED TRANSPORTATION (2019)
The electric autonomous dial-a-ride problem
Claudia Bongiovanni et al.
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL (2019)
Including preventive maintenance activities in an unrelated parallel machine environment with dependent setup times
Oliver Avalos-Rosales et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2018)
The dial-a-ride problem with electric vehicles and battery swapping stations
Mohamed Amine Masmoudi et al.
TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW (2018)
Sustainable supply chain management in the digitalisation era: The impact of Automated Guided Vehicles
Dimitrios Bechtsis et al.
JOURNAL OF CLEANER PRODUCTION (2017)
Minimizing the makespan on a single machine with flexible maintenances and jobs' release dates
Wei-Wei Cui et al.
COMPUTERS & OPERATIONS RESEARCH (2017)
Minimizing the total completion time on a parallel machine system with tool changes
A. Costa et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2016)
Modelling of integrated vehicle scheduling and container storage problems in unloading process at an automated container terminal
Jiabin Luo et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2016)
Parallel machine scheduling with maintenance activities
Jaewook Yoo et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2016)
Analysis of a parallel machine scheduling problem with sequence dependent setup times and job availability intervals
Ridvan Gedik et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2016)
Electric vehicle routing problem
Jane Lin et al.
NINTH INTERNATIONAL CONFERENCE ON CITY LOGISTICS (2016)
Simulation and experimental design methods for job shop scheduling with material handling: a survey
Chen Xie et al.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2015)
A heuristic for scheduling jobs on two identical parallel machines with a machine availability constraint
Xiuli Wang et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2015)
Methodologies to Optimize Automated Guided Vehicle Scheduling and Routing Problems: A Review Study
Hamed Fazlollahtabar et al.
JOURNAL OF INTELLIGENT & ROBOTIC SYSTEMS (2015)
Approximation schemes for parallel machine scheduling with availability constraints
Bin Fu et al.
DISCRETE APPLIED MATHEMATICS (2011)
Scheduling problems with multiple maintenance activities and non-preemptive jobs on two identical parallel machines
Kaibiao Sun et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2010)
Identical parallel-machine scheduling under availability constraints to minimize the sum of completion times
Racem Mellouli et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2009)
Parallel machine scheduling with machine availability and eligibility constraints
Lu-Wen Liao et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2008)
Survey of research in the design and control of automated guided vehicle systems
IFA Vis
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2006)
Minimizing the makespan for the flow shop scheduling problem with availability constraints
R Aggoune
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2004)
Minimizing job tardiness using integrated preventive maintenance planning and production scheduling
CR Cassady et al.
IIE TRANSACTIONS (2003)
Scheduling and routing algorithms for AGVs: a survey
L Qiu et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2002)