The cost effectiveness of new reservoir hydroelectricity: British Columbia?s Site C project

期刊

ENERGY POLICY
卷 169, 期 -, 页码 -

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.enpol.2022.113161

关键词

Electricity; Hydroelectricity; Climate change; Transmission; Decarbonization; Linear programming

资金

  1. Energy Modelling Initiative (EMI) -Institut de l'Energie Trottier

向作者/读者索取更多资源

This paper develops a methodology for evaluating the cost-effectiveness of new reservoir hydroelectric projects and applies it to the case study of the Site C hydroelectric project in Canada. The study finds that the value of the project is unlikely to exceed its total cost, except in scenarios where additional inter-provincial transmission capacity is built and 100% decarbonization of the electricity systems is achieved.
Large-scale, reservoir hydroelectric facilities can play an important role in decarbonizing the electricity sector. However, new hydroelectric facilities are costly, and several recent projects in Canada have been subject to cost over-runs. In this paper, we develop a methodology for evaluating the cost-effectiveness of new reservoir hydroelectric projects. We apply this methodology to a case study of the Site C hydroelectric project currently under construction in British Columbia, Canada. Our approach makes use of a purpose-built linear programming capacity expansion and dispatch model, resolved at an hourly frequency and incorporating detailed treatment of balancing area requirements, available wind and solar resources, watershed constraints on hydroelectric potential, and endogenous electricity trade. Our simulations reveal that the value of the Site C project is unlikely to exceed its total cost, and only exceeds the avoidable cost of project cancellation in scenarios where BC and Alberta build additional inter-provincial transmission capacity and aim for 100% decarbonization of their electricity systems. Site C provides a cautionary tale for policymakers and planners pursuing large hydro-electric projects. Potential cost over-runs can render large hydroelectric projects uneconomic relative to alternatives. The decision to complete the Site C project is only justified by its high sunk costs.