4.7 Article

Conceptual design of a small-capacity supercritical CO2 coal-fired circulating fluidized bed boiler by an improved design calculation method

期刊

ENERGY
卷 255, 期 -, 页码 -

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.energy.2022.124534

关键词

Supercritical CO2 cycle; Small-capacity boiler; CFB; Design calculation method; Process simulation

资金

  1. National Key Research and Development Program of China [2017YFB0601802]
  2. Key Research and Development Program of Jiangsu Province

向作者/读者索取更多资源

The carbon peak and neutrality strategy has led to a rapid increase in renewable energy. Small-capacity thermal power units with supercritical CO2 (S-CO2) cycle have great potential in developing regional renewable energy power grids due to their high efficiency and superior flexibility for peak shaving. This paper presents the conceptual design of a 100 MW small-capacity S-CO2 circulating fluidized bed coal-fired boiler using an improved boiler design calculation method. The optimization results show that increasing the hot air temperature and utilizing a flue gas cooler to recover residual heat of the flue gas can significantly improve the power generation efficiency of the S-CO2 unit.
Carbon peak and neutrality strategy leads to rapid increase of renewable energy. Small-capacity thermal power units with supercritical CO2 (S-CO2) cycle have great prospects in the vigorously developing regional renewable energy power grids for high efficiency and superior flexibility of peak shaving. However, there is no effective and efficient design and design method for this new-type boiler with S-CO2 instead of steam cycle. In this paper, a 100 MW small-capacity S-CO2 circulating fluidized bed (CFB) coal-fired boiler is conceptually designed by an improved boiler design calculation method based on the process simulation coupling detailed combustion and working fluid cycle. The results show that the strategy of both increasing hot air temperature and introducing flue gas cooler for recovery residual heat of flue gas is preferred in the small-capacity CFB S-CO2 boiler. Under the optimized bed temperature 910 degrees C and primary air ratio 0.7, the power generation efficiency of the 100 MW S-CO2 unit can be improved to similar to 47%, 8-9% higher than that of the same-capacity steam units. For boiler configuration, the conventional rectangular furnace is still applicable to the small-capacity S-CO2 boiler, but more high-temperature heating surfaces required to be arranged in the furnace to meet similar to 72% of heat absorption. (C) 2022 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据