Effects of critical success factors, BIM implementation strategies, and barriers on employer-initiated delays

期刊

出版社

TAYLOR & FRANCIS LTD
DOI: 10.1080/15623599.2022.2097041

关键词

Employer delays; critical success factors; BIM moderators; building information modelling (BIM); structural equation modelling (SEM)

向作者/读者索取更多资源

Limited research has been conducted on the delays caused by employers in building information modelling (BIM)-enabled projects. This study aimed to determine the effects of critical success factors, BIM implementation strategies, and barriers on employer-initiated delays in BIM-enabled projects. Through questionnaire analysis and structural equation modelling, it was found that the relationships between success factors and employer-initiated delays were influenced by BIM implementation strategies and barriers.
Limited research has been performed on the delays caused by employers in building information modelling (BIM)-enabled projects. Thus, this study aimed to determine the effects of critical success factors, BIM implementation strategies, and barriers to employer-initiated delays in BIM-enabled projects. A total of 197 completed questionnaires were collected from various countries and analysed using the structural equation modelling approach. The effects of moderators were studied. The relationships of the success factors to the employer-initiated delays were found to be affected by the BIM implementation strategies and by the BIM barriers. A correlation analysis was conducted between the success factors and the employer-initiated delay factors for the BIM project, emphasising countries or continents lacking delay studies, such as the United States, the United Kingdom, Australia, and China. The key results reveal that BIM implementation strategies have a significant impact on relationships involving management, organisational, and financial planning and team success aspects in employer-initiated delays, also, a significant impact of the BIM barriers on the same relationships has also been confirmed. This study contributes to the development of a comprehensive managerial framework to address employer-initiated delays in BIM-enabled projects.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

3.9
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据