4.7 Article

Landfill leachate treatment by sequential membrane bioreactor and electro-oxidation processes

期刊

JOURNAL OF ENVIRONMENTAL MANAGEMENT
卷 184, 期 -, 页码 318-326

出版社

ACADEMIC PRESS LTD- ELSEVIER SCIENCE LTD
DOI: 10.1016/j.jenvman.2016.10.010

关键词

Landfill leachate; Membrane bioreactor; Electro-oxidation process; Energy consumption; Removal efficiency; Di 2-ethyl hexyl phthalate

资金

  1. National Sciences and Engineering Research Council of Canada (NSERC) [I2IPJ461378]

向作者/读者索取更多资源

Combination of high performance membrane bioreactor (MBR) equipped with ultrafiltration and electrooxidation process (EOP) by boron-doped diamond electrode (BDD) was used to effectively treat highly contaminated old landfill leachate. MBR and EOP were optimized for raw and pretreated landfill leachate. Seasonal changes dramatically affected the both processes' performance, as the landfill leachate was 34 more concentrated in winter. For MBR, organic load rate of 1.2 gCOD/L/day and sludge retention time of 80 days was considered as the optimum operating condition in which COD, TOC, NH4+ and phosphorous removal efficiencies reached the average of 63, 35, 98 and 52%, respectively. The best performance of EOP was in current intensity of 3 A with treatment of time of 120 min. Effluent of electro-oxidation was more toxic due to the presence of radicals and organochlorinated compounds. These compounds were removed by stripping or assimilation of sludge if EOP was used as a pretreatment method. Furthermore, the energy consumption of EOP was decreased from 22 to 16 KWh/m(3) for biologically treated and raw landfill leachate, respectively. Crown Copyright (C) 2016 Published by Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据