4.7 Article

Collaborative scheduling of spare parts production and service workers driven by distributed maintenance demand

期刊

JOURNAL OF MANUFACTURING SYSTEMS
卷 64, 期 -, 页码 261-274

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.jmsy.2022.06.012

关键词

Maintenance; Collaborative scheduling; Spare parts production; Service workers; Optimization algorithm

资金

  1. National Key Research and Devel- opment Program of China [2018YFB1701400, 2020YFB1712100]
  2. Foshan Technological Innovation Project [1920001000041]
  3. National Natural Science Foundation of China [61973108]
  4. State Key Laboratory of Advanced Design and Manufacturing for Vehicle Body, Hunan University [71775004]
  5. State Key Laboratory of Construction Machinery [SKLCM2019-03]

向作者/读者索取更多资源

This study analyzes the joint scheduling of spare parts production and service workers driven by distributed maintenance demand. By integrating spare parts production and worker allocation, the study aims to optimize customer satisfaction and total service cost. A modified algorithm is proposed to solve the problem, and extensive experiments demonstrate its superiority.
We analyse the joint scheduling of spare parts production and service workers driven by distributed maintenance demand. For each failure, a service worker and a necessary spare part must be assigned for on-site maintenance. In particular, the spare part is not supplied from stock, but is delivered directly from the factory to the maintenance site through just-in-time production. Spare parts production and worker allocation are integrated to optimize two objectives: customer satisfaction and total service cost. To solve the problem, we first construct a mathematical model. Subsequently, a modified non-dominated neighbor immune algorithm (MNNIA) is proposed, in which a knowledge-based initialization rule, an idle time insertion method, and two problem-specific local search operators are developed to enhance exploitation. Extensive experiments and comparisons are conducted to demonstrate the superiority of MNNIA. Furthermore, compared with that of the separate decisionmaking mode of spare parts production and worker arrangement, the effectiveness of the integrated scheduling mode is verified.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据