A Case Study of Energy-Saving and Frost Heave Control Scheme in Artificial Ground Freezing Project

期刊

GEOFLUIDS
卷 2022, 期 -, 页码 -

出版社

WILEY-HINDAWI
DOI: 10.1155/2022/1004735

关键词

-

资金

  1. National Natural Science Foundation of China [52178340]
  2. Science Foundation of Tiandi Technology Co., Ltd. [KJ-2021-JJZD-07]

向作者/读者索取更多资源

This study identifies the applicability and superiority of intermittent freezing in large-scale shallow buried freezing projects, and proposes optimization schemes for increasing the thickness of the freezing wall and average temperature. It also suggests specific measures for frost heave control.
In large-scale shallow buried artificial ground freezing (AGF) engineering, frost heave control and energy-saving have always been the most critical problems. By the research and analysis, this manuscript points out the applicability and superiority of intermittent freezing in large-scale shallow buried freezing projects and conducts in situ tests for the freezing project of a metro entrance. The test results show that intermittent freezing can effectively control the surface frost heave, but it has a certain hysteresis. The freezing wall thickness, average temperature, and optimization scheme during the freezing process are discussed. The results show the following: (1) Intermittent freezing would degrade the thickness of the freezing wall and the average temperature together. (2) The stop freezing scheme in intermittent freezing is not fit to frost heave control during the excavation stage. Therefore, it is necessary to establish a freezing cycle scheme with precise temperature control to control the frost heave to ensure the bearing capacity. Based on the above conclusions, a dual-circuit liquid supply scheme, the specific brine temperature control scheme, and its application method were proposed. Through this method, the development process of the freezing front can be effectively controlled, and the goal of being precise and controllable can be achieved. This research can provide practical technical guidance for frost heave control of similar AGF projects.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据